TitleProduct

Hollow Concrete Brick Making Machine

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Fujian

  • Validity to:

    Long-term effective

  • Last update:

    2017-09-29 14:08

  • Browse the number:

    125

Send an inquiries

Company Profile

Sinotruk Hubei Huawin Imp. & Exp. Co., Ltd.

By certification [File Integrity]

Contact:Mr. David Huang(Mr.)  

Email:

Telephone:

Area:Fujian

Address:Fujian

Website: http://qunfeng-machine.sunla-tech.com/

Product Details


1. Technical specification of QFT6-15 concrete block, brick, interlock paver, curb stone, slab, wall tile making machine specification
 
Capacity per mould: 6 pcs/mould (Standard Block: 400x200x200mm)
21pcs/mould (Solid Block: 230x110x75mm)
15 pcs/mould (Interlock: 225x112.5x60mm)
21 pcs/mould (Holland Brick: 200x100x60-80mm)
Cycle Time: 12-25 seconds
Capacity per shift(8 Hours): Hollow Block (400x200x200mm): 8640pcs
Solid Block (230x110x75mm): 40320pcs
Interlock (225x112.5x60mm): 18000 pcs
Holland Brick (200x100x60-80mm): 24192 pcs
Vibrating Frequency: 1500~4100 r/min.
Vibrating Force: 60KN
Motors Power: 37.5KW
Machine Dimensions: 3270X1850X3200MM
Pallet Size: 850X680mm
Gross Weight: about 8T
 
 
2. Advantages of QFT6-15 block, paver and curb making machine
 Vibration table is designed work in high frequency and low amplitude, increase 10% block strength and reduce at least 10db noise.
 Automatic Siemens control system and raw material ratio record system increase 20% efficiency
 Frequency conversion technology makes each hydraulic cylinder working with changeable speed: high speed in front period and slow down in rear period, which could reduce damage to finished block and machine/
 Fault alarm system, saving 30% time in troubleshooting.
 Moulds are processed with the procedures of carburizing, nitriding and quenching to make strength to HRC61, and lifespand at least 1,200,000 cycles.

3. Production line preparation:
 Labor: 6~8 workers/shift
 Electricity consumption: 50kW/hour
 Land:3500m2 (800m2workshop,500m2raw materials storage,600m2wet block curing yard,1600m2 finished block storage.)
 Guarantee period:12 months after block machine finished installation.
 Installation: Qunfeng will send one technician to install machine and train customer's workers.






QUNFENG MACHINERY